CÔNG TY TNHH ITVC TOÀN CẦU

Ngôn ngữ: vien

0914 564 579

Giờ làm việc: 08:00–17:00 (Thứ 2–Thứ 7)


Energy service projects

Energy audit at Vinausteel – Vietnam–Australia Steel

2026-09-28 03:55:10 | Lượt xem: 5 | Energy service projects

In 2022, ITVC Global was again selected to carry out an energy audit at the Vinausteel steel manufacturing plant.

This report records the 2022 project. Figures, practices, factory scale and proposals reflect the survey period; they do not establish the factory’s current status.

Company profile at the time of the project

VINAUSTEEL was established in 1994 as a construction steel manufacturing joint venture between Vietnam Industrial Investments (VII) of Australia and Vietnam Steel Corporation (VNSTEEL). The original project report described annual production and supply capacity of 300,000 tonnes, with main products comprising 10–32 mm hot-rolled reinforcing bars and D6/D8 plain wire rod. It reported quality controls under ISO 9001 and conformity with relevant Vietnamese and international product standards.

The Vietnam–Australia Steel (Vinausteel) factory in the original photograph.
The Vietnam–Australia Steel (Vinausteel) factory in the original photograph.

Measures already implemented

Alongside brand development, the company focused on reducing energy use in production and improving competitiveness in quality and cost. Measures recorded in the original report included:

  • Shifting electricity use from peak to off-peak periods.
  • Using natural daylight and progressively replacing inefficient lamps.
  • Using compressed natural gas (CNG) instead of fuel oil (FO) for billet reheating.
  • Maintaining machinery regularly to improve performance and reduce electricity losses from friction, overheating and similar causes.

Repeat energy audits on a three-year cycle helped the company review implementation of earlier measures and identify new opportunities. Continuous improvement and lower energy-related production costs were part of its development approach.

Proposed measures

The audit proposed the following measures:

  • Establish an energy management system based on ISO 50001:2018.
  • Replace high-pressure mercury lamps with energy-efficient solar-powered LED lights.

Survey photographs

Survey and electrical measurements on the production line.
Survey and electrical measurements on the production line.
Steel rolling area and electrical measurements during the audit.
Steel rolling area and electrical measurements during the audit.

ITVC GLOBAL · SERVICE ENQUIRIES

Discuss energy audits and energy management with ITVC

Share your requirements and preferred timing. ITVC will review your enquiry and discuss a suitable service scope.

Send a service request →

Call for quotation: 0914 564 579
Ho Chi Minh City: 0859 553 986
Email: itvc.haiphong@itvc-global.com

Head office: 6th Floor, 22 Ly Tu Trong, Hong Bang Ward, Hai Phong, Vietnam.




Copyright © 2014 ICTV. All Rights Reserved.

tư vấn iso, tu van iso, kiểm toán năng lượng, kiem toan nang luong

0914 564 579