Inspection and verification

Chemical Incident Prevention Measures: Historical Application Procedure

Chemical Incident Prevention Measures: Historical Application Procedure

07-12-2015 02:31:14 | Inspection and verification

The table records the former procedure for confirming chemical incident prevention and response measures under Circular 20/2013/TT-BCT. It is historical information, not a current application guide. Xem thêm

Chemical Incident Prevention Plans under Circular 20/2013 — Historical Guidance

Chemical Incident Prevention Plans under Circular 20/2013 — Historical Guidance

07-12-2015 02:24:11 | Inspection and verification

On 5 August 2013, the Ministry of Industry and Trade issued Circular 20/2013/TT-BCT on chemical incident prevention and response plans and measures. This article records its historical requirements; the circular ceased to have effect on 28 December 2017. Xem thêm

Furnace heat treatment for welded structures and metal components

Furnace heat treatment for welded structures and metal components

22-06-2015 05:04:35 | Inspection and verification

ITVC Global provides furnace heat treatment for welded structures and metal components. Hardening temperatures can reach 1,100 °C. Xem thêm

Post-weld heat treatment of a gas separator vessel

Post-weld heat treatment of a gas separator vessel

18-06-2015 10:16:25 | Inspection and verification

On 5 June 2015, ITVC Global performed post-weld heat treatment on a gas separator vessel manufactured at Dai Phat Equipment Co., Ltd. in Thai Nguyen. Xem thêm

Cargo Damage Survey Procedure

Cargo Damage Survey Procedure

22-05-2015 08:35:19 | Inspection and verification

ITVC Global outlines the steps for reporting cargo damage, preserving evidence, preparing documents and conducting a damage survey. Xem thêm

Tank capacity calibration at MIPEC — January 2015

Tank capacity calibration at MIPEC — January 2015

31-01-2015 02:52:24 | Inspection and verification

Reverification of two vertical cylindrical tanks with a stated capacity of 1,250 m³. Xem thêm

Steps in post-weld heat treatment

Steps in post-weld heat treatment

23-12-2014 06:13:41 | Inspection and verification

ITVC Global is a specialist provider of post-weld heat-treatment services. Xem thêm

Steps for Post weld heat treatment services

Steps for Post weld heat treatment services

29-12-2015 08:04:43 | Inspection and verification

ITVC Global is a professional provider in Preheat and PWHT survices During the welding process, the two metal pieces being joined are subject to extreme temperatures and can cause the crystalline structure of the metal to pass through various metallurgical phases. As a result, hardening (and embrittlement) of the metal can occur to varying degrees (usually dependent on carbon content). Heat treatment is designed to reduce the hardness in the heat affected zone of the metals and also increase ductility in these sections. Various pressure vessel codes contain the specifics regarding the procedures for post-weld heat treatment. Xem thêm

LPG Quantity Surveys, Sampling and Quality Testing

LPG Quantity Surveys, Sampling and Quality Testing

26-12-2015 04:20:13 | Inspection and verification

How LPG quantity is determined on vessels and in shore tanks, how samples are taken, and how quality tests are selected to meet delivery requirements. Xem thêm

Vessel Draft Survey Procedure

Vessel Draft Survey Procedure

26-12-2015 03:18:30 | Inspection and verification

Five stages of a draft survey: check documents, read six draft marks, measure water density, determine deductions and calculate cargo quantity using hydrostatic tables. Xem thêm