Use the hierarchy of controls to prioritise elimination, substitution, engineering controls, administrative controls and personal protective equipment. Selection should be based on risk assessment and verification of effectiveness.
Start by eliminating the hazard wherever possible. Where it cannot be eliminated, reduce exposure and risk using the most effective feasible controls, considering the following options:

These options form a hierarchy because controls higher in the hierarchy should be prioritised where feasible. Safer design and isolation are normally engineering controls, rather than separate universal levels.
To choose appropriate controls, consider:

Text version of the hazard-control diagram:
The ‘No’ arrows move to the next option. These options may also be combined; chemical ventilation and respiratory protection must be selected for the assessed exposure.
Several controls may be needed together. PPE is generally the least effective level in the hierarchy because it depends on correct selection and consistent use. Use it when higher-level controls are being developed, cannot sufficiently reduce exposure, or are not feasible; do not rely on PPE alone when more effective controls are available.
Respiratory protection, for example, can be ineffective if unsuitable for the hazard, clogged or poorly fitted. Leakage around the face can allow exposure. PPE may also be hot, awkward or uncomfortable, affecting consistent use. Provide adequate resources, training, maintenance and supervision to ensure controls remain effective. A lower initial cost does not necessarily mean a lower long-term cost.

Text version of the risk-control flowchart:
The original arrows label the decisions ‘Yes’ and ‘No’. Controls may need to be combined and reviewed; this diagram is not a substitute for task-specific risk assessment.
Monitor implemented controls to confirm that risk is adequately controlled and that new hazards have not been introduced. Workers’ feedback is an important part of checking whether the controls achieve their intended purpose.

Accessible version of the control-options table:
| Option | Intended result | Examples in the original table |
|---|---|---|
| Elimination | Remove the hazard and its associated risk permanently where feasible. | Use pre-mixed chemicals in purpose-designed containers to avoid an on-site mixing task. |
| Substitution | Change the process or perform the task in a safer way. | Use lifting equipment instead of manual lifting. |
| Isolation | Place a barrier between people and the hazard. | Partitions between work areas; barriers around a chemical spill; separation from radiation work. |
| Engineering controls | Physically change equipment or the work environment. | Anti-glare screens; brakes or foot brakes on trolleys. |
| Administrative controls | Use management decisions and documented arrangements. | Safe operating procedures; warning signs, markings and lights; training; job rotation; maintenance logs. |
| Personal protective equipment | Wear equipment or clothing to reduce exposure and injury risk. | Eye protection, aprons, hair nets, protective boots, safety harnesses, face and hearing protection, gloves and protective clothing. |
Classification depends on the specific hazard. Pre-mixed chemicals can remove a mixing task without eliminating the chemical hazard; lifting aids and isolation are usually engineering controls. The table’s categories are illustrative, while the standard five-level hierarchy is shown above.
This article explains how the hierarchy of controls supports eliminating hazards and reducing occupational health and safety risks within an ISO 45001 management system.
ITVC GLOBAL · SERVICE ENQUIRIES
Share your requirements and preferred timing. ITVC will review your enquiry and discuss a suitable service scope.
Call for quotation: 0914 564 579
Ho Chi Minh City: 0859 553 986
Email: itvc.haiphong@itvc-global.com
Head office: 6th Floor, 22 Ly Tu Trong, Hong Bang Ward, Hai Phong, Vietnam.
Dịch vụ của chúng tôi
Tin tức & Sự kiện
Thư viện ảnh
Thư viện video
Copyright © 2014 ICTV. All Rights Reserved.
tư vấn iso, tu van iso, kiểm toán năng lượng, kiem toan nang luong