2015-10-27 06:39:43 | Lượt xem: 3049 | Energy and greenhouse gases
An archived cleaner production project in metal manufacturing reported a payback period of around one month.
The following cases record cleaner production research in the metal products industry during 1999–2000. The results cover materials and energy efficiency as well as waste reduction, illustrating a broad approach to improving production.

The study focused on cleaning operations in galvanised wire production, at a scale of 9,000 tonnes per year.
Both studies were presented with support from the Vietnam Cleaner Production Centre. The figures are historical and have not been adjusted to current prices. Financial benefits include the broader results of cleaner production, rather than electricity savings alone. Companies should carry out their own surveys and calculations before applying the measures.
ITVC GLOBAL · SERVICE ENQUIRIES
Share your requirements and preferred timing. ITVC will review your enquiry and discuss a suitable service scope.
Call for quotation: 0914 564 579
Ho Chi Minh City: 0859 553 986
Email: itvc.haiphong@itvc-global.com
Head office: 6th Floor, 22 Ly Tu Trong, Hong Bang Ward, Hai Phong, Vietnam.
Dịch vụ của chúng tôi
Tin tức & Sự kiện
Thư viện ảnh
Thư viện video
Copyright © 2014 ICTV. All Rights Reserved.
tư vấn iso, tu van iso, kiểm toán năng lượng, kiem toan nang luong