2026-09-28 03:54:39 | Lượt xem: 5 | Energy and greenhouse gases
In 2021, NewHope Hanoi Co., Ltd. – Hai Phong Branch renewed its energy audit contract with ITVC Global Co., Ltd., following the three-year cycle required by the Ministry of Industry and Trade for the facility.
This report records the 2021 project. Figures, practices, factory scale and proposals reflect the survey period; they do not establish the factory’s current status.
During the energy audit at NewHope Hanoi Co., Ltd. – Hai Phong Branch, the team carried out a site survey, collected data and took measurements at the factory. Total energy consumption recorded for the first nine months of 2021 was 1,391 TOE.

The report recorded variable-speed drives in the raw material feed flow-control system after grinding and in the air compressor system. LED lighting was already used in the factory and offices. These practices provided a starting point for reviewing further energy-efficiency opportunities.
These were proposals made during the project. Before investing or changing operations, the company needs to define the scope, technical conditions and monitoring method. The figures reflect the 2021 survey period.
The photographs below are retained from the original project report.


ITVC GLOBAL · SERVICE ENQUIRIES
Share your requirements and preferred timing. ITVC will review your enquiry and discuss a suitable service scope.
Call for quotation: 0914 564 579
Ho Chi Minh City: 0859 553 986
Email: itvc.haiphong@itvc-global.com
Head office: 6th Floor, 22 Ly Tu Trong, Hong Bang Ward, Hai Phong, Vietnam.
Dịch vụ của chúng tôi
Tin tức & Sự kiện
Thư viện ảnh
Thư viện video
Copyright © 2014 ICTV. All Rights Reserved.
tư vấn iso, tu van iso, kiểm toán năng lượng, kiem toan nang luong