ITVC GLOBAL · BUSINESS SERVICES
Steps to implement IATF 16949
As with management systems based on standards such as ISO 9001, developing and implementing an IATF 16949 quality management system follows the PDCA (Plan–Do–Check–Act) cycle. ITVC presents the implementation steps below.
1. Preparation
-
Define the purpose and scope of the quality management system;
-
Establish an IATF 16949 implementation steering committee;
-
Appoint the responsible roles specified in the implementation arrangements, including a Quality Management Representative (QMR);
-
Appoint a Customer Representative (CR) and assign responsibility for a coordinating secretary where necessary;
-
Provide general awareness training on IATF 16949;
-
Assess the current situation against IATF 16949 requirements through a gap analysis;
-
Prepare an implementation plan, including an overall ISO/TS 16949 implementation plan and a detailed plan for developing the documented system;
-
Prepare and allocate the resources needed to develop and implement the system.
2. Develop the quality management system
-
Provide awareness and interpretation training on IATF 16949 requirements;
-
Guide the development of documentation;
-
Establish the QMS documentation;
-
Provide training on understanding and applying the 6 Core Tools;
-
Develop practical skills in the six essential tools used in IATF 16949 implementation — the 6 Core Tools:
-
APQP — Advanced Product Quality Planning
-
Control Plan (CP): link the process flow diagram and PFMEA to control methods and reaction plans at each process step.
-
PPAP — Production Part Approval Process
-
MSA — Measurement Systems Analysis
-
FMEA — Failure Mode and Effects Analysis
-
SPC — Statistical Process Control
-
Develop problem-solving skills;
-
Develop teamwork skills.
See ITVC’s 6 Core Tools consulting and training service, which includes practical work on Control Plan as a separate tool and its links to APQP, PFMEA, MSA, SPC and PPAP.
3. Put the system into practice
-
Issue the management system processes and provide guidance on their application;
-
Implement and monitor their application across departments;
-
Review and improve processes and documentation to ensure that work is controlled conveniently and effectively.
4. Internal audits and management review
-
Train internal auditors for the IATF 16949 quality management system;
-
Plan and conduct internal audits, including QMS audits, manufacturing process audits and product audits;
-
Correct deficiencies and improve the system following the audits;
-
Conduct management review of quality performance.
5. Certification application and audit
-
Conduct an optional pre-audit;
-
Complete the stage 1 certification audit (readiness review);
-
Implement corrective actions and improvements;
-
Verify the readiness of the system following the stage 1 audit;
-
Complete the stage 2 certification audit;
-
Implement corrective actions and improvements;
-
Obtain an IATF 16949 certificate, valid for three years;
-
Maintain and continually improve the system and undergo periodic surveillance by the certification body at 12-month intervals.
Download IATF 16949 internal audit checklist:
IATF 16949 internal audit checklist
Related content: