CÔNG TY TNHH ITVC TOÀN CẦU

Ngôn ngữ: vien

0914 564 579

Giờ làm việc: 08:00–17:00 (Thứ 2–Thứ 7)


Machinery and production-line integration assessment

ITVC GLOBAL · BUSINESS SERVICES

Machinery and production-line integration assessment

A production line may be supplied by one manufacturer or assembled from equipment made by several manufacturers. Design engineers select compatible equipment to create an integrated line. To assess whether machinery imported for an industrial project forms a coordinated production line, ITVC Global provides machinery and production-line integration assessment.

Illustration of equipment operating together in an integrated production line.
Illustration of equipment operating together in an integrated production line.

1. Purpose

  • Assess the integration of imported machinery as a basis for buyers, sellers and related parties to accept the equipment and close out purchase contracts.
  • Provide technical evidence for customs and import-duty assessment. Integration of a production line does not by itself guarantee an import-duty exemption; eligibility depends on the project, goods, documentation and applicable rules.
  • Support regulatory requirements during the import or export of machinery and equipment.

Reference: import-duty provisions and applicable amendments

Items covered

Machinery within production lines, integrated equipment systems and equipment assemblies imported or exported for industrial projects.

Service scope

  1. Review import documentation: bills of lading, packing lists, purchase contracts, design documents and equipment specifications.
  2. Inspect packaging, labels, quantities, types and condition of the components of the production line during import.
  3. Supervise equipment installation.
  4. Witness equipment commissioning and test runs.
  5. Assess compatibility and coordination in speed, power, throughput and other technical parameters.
  6. Photograph the inspection process.
  7. Prepare an inspection report and issue the inspection certificate covering the integration assessment.

ITVC GLOBAL · SERVICE ENQUIRIES

Arrange a production-line integration assessment with ITVC

Share your requirements and preferred timing. ITVC will review your enquiry and discuss a suitable service scope.

Send a service request →

Call for quotation: 0914 564 579
Ho Chi Minh City: 0859 553 986
Email: itvc.haiphong@itvc-global.com

Head office: 6th Floor, 22 Ly Tu Trong, Hong Bang Ward, Hai Phong, Vietnam.

 



Copyright © 2014 ICTV. All Rights Reserved.

tư vấn iso, tu van iso, kiểm toán năng lượng, kiem toan nang luong

0914 564 579