ITVC GLOBAL · BUSINESS SERVICES
DMAIC provides five phases for a Lean Six Sigma improvement project. ITVC Global introduces the activities and outputs of each phase below.
Define establishes the improvement project and the outcomes expected by management. The team should clarify three basic areas:
Measure establishes a reliable, quantitative baseline for process performance. Evaluate the measurement system and collect data on the process and its stages. Identify variables relevant to stability and the ability to meet requirements; assess process capability or defect measures where appropriate.
Discuss DMAIC project implementation support with ITVC
Send your requirements so ITVC can advise on the service scope and provide a suitable quotation.
Send a service request →Analyse investigates the root causes of the problem and identifies the priority areas for improvement. Examine the causes and effects of process variation and confirm the factors that the improvement work needs to address.
Improve develops and implements solutions to address the confirmed causes. Where needed, pilot or test the proposed changes and compare the results with the objectives established in Define.
Control sustains the improvement by standardising the agreed methods, updating procedures, assigning responsibilities and monitoring ongoing performance.
Improvement raises the performance of an existing process, for example from a lower to a higher sigma level where the measure is appropriate. Establish the baseline and defects per million opportunities (DPMO), then investigate variation in people, machines, materials, methods and information. The aim is to reduce defects and improve capability; results depend on the process and the effectiveness of the changes.
An existing process may eventually reach practical limits that incremental changes cannot overcome. There is no universal ceiling at 4.6 or 4.7 sigma. A major redesign may need different technology or methods and a design framework such as DMADV. Translate customer requirements into the new product or process design and verify that the design meets them.
After improvement or redesign, management must maintain stable operation under the new conditions. Monitor performance against the agreed limits, identify significant patterns or changes and act when the process no longer performs as intended.
ITVC GLOBAL · SERVICE ENQUIRIES
Share your requirements and preferred timing. ITVC will review your enquiry and discuss a suitable service scope.
Call for quotation: 0914 564 579
Ho Chi Minh City: 0859 553 986
Email: itvc.haiphong@itvc-global.com
Head office: 6th Floor, 22 Ly Tu Trong, Hong Bang Ward, Hai Phong, Vietnam.
Copyright © 2014 ICTV. All Rights Reserved.
tư vấn iso, tu van iso, kiểm toán năng lượng, kiem toan nang luong